"handwork"

Euroa Quilt Update - Passed the Halfway Mark

Euroa quilt Cheryl Arkison

When I passed the halfway mark a few weeks ago I must admit that I had conflicting emotions. On the one hand, I was thrilled that I’d made it this far. On the other, I’d only made it this far?

My trip to Australia was nearly 4 years ago, and that is where the original inspiration for this quilt came from. The threshold to a cafe in a little town called Euroa. Turns out that tile was pretty common in Australia as I’ve heard from many people since that they or their grandparents had it in their house. I made the first block… let me check now… in April of 2017.

It took me almost 3 years to get halfway.

I do recall not touching the blocks when I had a bout of tennis elbow. That was months and months of no hand stitching (completely solved by getting a new pillow, by the way). Some weeks and months the work is constant in any down the or pool deck or outside the dance studio time. Then I may not touch a block for a few weeks.

Euroa Quilt Modern English Paper Piecing Cheryl Arkison

So yeah, I may be a bit bummed that it’s taken almost 3 years to get this far, I can fully acknowledge and appreciate that life is life. Also, I am doing this entirely by hand. That’s a lot of work adding up to something glorious. Well, I think it’s glorious.

In the end, I have no doubt that this will be a special quilt. For the memories of the inspiration, gratefulness for the moments of making, gratitude for my hands and body being able to bring this together, and pure love for the beauty. If it takes me another 3 years to finish, then so be it.

All I know is that I wold love to go back to Euroa when it is done to take a picture in its inspirational namesake.

English Paper Piecing Cheryl Arkison

For those curious…

  • Each block contains 16 pieces. I can print the templates on a piece of card stock. Indeed, I designed the templates so that they could be printed easily, that’s why each block is 8’’ square.

  • I pick the fabric for each block in a way I would refer to as controlled random. I have a stack of fabric and try not to have the same fabric too close to itself. Otherwise, I am not too fussy about it.

  • Each block gets prepped by cutting apart the template, picking the fabric, glueing the template to the fabric with a dab from a glue stick, then trimming excess fabric.

  • Thread basting works best for me. It is the most portable, a must have option for me. Also, it’s a great way to use the bit of thread left on a bobbin or spool that would otherwise be wasted.

  • Once I have all 16 pieces basted I stitch them together with a flat back stitch.

  • 4 blocks together become a mega block. 5 mega blocks become a column. There will be 5 columns in the finished quilt.

Summering Part 2

Well, it turns out I was completely burnt out and I didn’t know it. Taking copious amounts of fresh air, friends, and family and the subsequent actual relaxation I felt made me realize that. Huh, who knew? Any quilting I did was because I wanted to or only to play. So before I totally jump back in to the chaos and and schedules now that the kids are back in school let me linger in summer a little bit longer.

Camping on the Sheep River with friends.

Camping on the Sheep River with friends.

Still tried to swim for exercise, back is improving.

Still tried to swim for exercise, back is improving.

Met and visited with Katja Marek at her gorgeous store in Kamloops.

Met and visited with Katja Marek at her gorgeous store in Kamloops.

Mount Robson, the start of our road trip.

Mount Robson, the start of our road trip.

Ferry rides.

Ferry rides.

In Cowichan Bay with the bioluminescent plankton after the sunset.

In Cowichan Bay with the bioluminescent plankton after the sunset.

Catching a winter supply of salmon.

Catching a winter supply of salmon.

Parksville beach. Those tides!

Parksville beach. Those tides!

Solitary morning walks.

Solitary morning walks.

Trying something new!

Trying something new!

My ballet boy at the Aga Khan Gardens.

My ballet boy at the Aga Khan Gardens.

The two projects I worked on it August.

The two projects I worked on it August.

I realize that sharing these is kind of like watching someone else’s slide show. But maybe I can share a deep breath with you and it can carry us all through the busy month ahead.

Summering

Like most self employed parents, summer is a twisted evil. Yay for free time! Oh crap, how am I going to get anything done? This year I’ve prioritized the family and the family business. Which has meant odd hours of working and as much play as we can fit in. It’s meant cabins and camping and fancy hotels. It’s meant friends and cousins and celebrating.

And only a little bit of quilting. I won’t lie, it’s been nice to take a break from the churn, from the need for More. Content. Now.

Morning Make with the kids, quilting when I can figure out my tempermental machine, hand stitching by the lake or on a plane, storm watching, getting our feet dirty, eating as many cherries as our bellies will hold, milkshakes in the afternoon.

Summer so far…

Johnston Canyon Lower Falls

Johnston Canyon Lower Falls

Castle Mountain

Castle Mountain

Sunset swim (plus moonlight and all the day swims)

Sunset swim (plus moonlight and all the day swims)

Best friends on the beach

Best friends on the beach

Euroa on the beach

Euroa on the beach

Vegas pool views

Vegas pool views

Actually went to Vegas to work (Woodworking tools trade show - a little bit bigger than Quilt Market)

Actually went to Vegas to work (Woodworking tools trade show - a little bit bigger than Quilt Market)

Plugging away at quilting this scrappy beauty

Plugging away at quilting this scrappy beauty

Here’s to summering where ever you are. Or wintering, for those in the Southern Hemisphere. Either way, let’s raise a glass to enjoying each day and prioritizing what is right for you right now.

Euroa Quilt Update

Euroa Quilt English Paper Piecing

And done.

Not the quilt, just the second row. It seems I am on track for one row a year as I started this quilt a little over two years ago. I haven’t quite worked up the energy to assemble the two rows together. More accurately, I haven’t found the time to clear the dining room table to do so because that is the only place I can do it.

This whole thing is sewn together via the flat back stitch. I love it! Unlike a whip stitch, which most of us seem to use for EPP, the stitches totally disappear with the flat back stitch. On the small scale it is no less portable than the whip stitch. I always have my sketch book with me so I tape my pieces together on then get right to stitching. On the large scale though, like when I have a mega block together or am assembling a row like this, I need to go back to my old stand by - the dining room table.

In time for summer I should have the two rows together and the next batch of blocks ready for work. Slow and steady on this project. I will say that finishing this row is motivation. Yes it is only row two out of five, but seeing it all together is exciting! It reminds me that my work is indeed getting me somewhere. One block at a time it seems interminably slow, but I am drinking in the process. Camping, road trips, and the odd lazy afternoon are coming up, perfect for a little more assembly. Probably by the time I get the third row done it will be dandelion season again!